سSyaq Al TashyeedDesign · Construction · Supervision
SYAQ ALTASHYEED · RIYADH

Finishing Cost Calculator
Detailed Estimate in Riyadh 2026

Plan your project budget. Select items and enter quantities to see an estimate and work summary in one place.

72 detailed items14 work categoriesPrintable summary
Interactive Calculator

Estimate Your Project Cost

Enter your project details for a printable estimate covering floor areas, excavation, basement, elevator, pool and roof seating areas.

Service Type
Quality Level
Area Calculation Method

If you know the total floor area, enter it directly. Example: ground 100 + first 100 + upper annex 50 = 250 m².

Enter the total built floor area. For a total of 250 m², enter 250.

Project Extras

Total built area is used directly. Choose land area mode to calculate the basement, excavation and roof seating separately.

Results are approximate and depend on the calculator inputs.

How Much Does a Villa Cost to Build in Riyadh?

Villa construction costs depend on land area, street count and width, estimated coverage, and the selected structural, finishing or turnkey service. A basement, elevator, pool and roof seating also affect the total. This calculator provides an initial budget before a final quotation or drawing review.

Residential construction is usually estimated using the expected built floor area, service type and quality level. Use this tool for an initial estimate of structural, finishing or turnkey villa costs in Riyadh.

Typical Villa Cost Distribution

Concrete Structure40%
Finishing Works40%
Electrical and Mechanical Works10%
External Works and Annexes10%

Indicative distribution only; these percentages are not added to the calculator total.

What Does the Price Usually Include?

  • Excavation and foundations.
  • Concrete structure and shell works.
  • Basic installations according to the selected service.
  • Finishing to the selected quality level.
  • Basement, elevator, pool and roof seating when selected.

The service type determines the included work. Priced extras are shown separately in the result.

Basement, Pool, Elevator and Roof Seating

Many Saudi villa projects assume a basement of approximately 60% of the ground floor area. You may adjust this to your design. Basement structural work uses a higher factor to account for excavation, waterproofing and concrete.

An elevator, pool or roof seating can materially affect the total. Roof seating is calculated from the roof area remaining after the upper annex, using the selected commercial, standard or luxury rate.

Indicative Villa Construction Stages

Excavation and Foundations2–3 weeks
Concrete Structure2–3 months
Basic Installations1–2 months
Finishing and Handover3–5 months

An indicative overall villa programme is often 8–12 months, depending on size, finishing level and additional work.

Need Detailed Item Prices?

Use the detailed finishing calculator to estimate specific work items and quantities.

Riyadh Villa Cost FAQs

Does This Calculator Give a Final Price?

No. It gives an initial estimate from your inputs. Final pricing depends on drawings, site location and inspection.

Can It Include a Basement, Elevator and Pool?

Yes. These are included in the estimate when their options are selected.

How Is Roof Seating Calculated?

Roof seating uses the roof area remaining after the upper annex, at the rate for the selected quality level.

Important Notes

  • The estimate is not a final quotation.
  • Final accuracy depends on drawings, location and work scope.
  • Estimated coverage uses the street count and main street width, assuming a square plot.
  • You may adjust the basement percentage to suit your project.
  • This interactive calculator estimates construction costs in Riyadh.

Area percentages and excavation factors are adjustable estimating assumptions, not engineering approval or municipal regulations.

Interactive Calculator

Estimate Detailed Finishing Costs

Enter the quantity for each required item. Leave unused items at zero.

Prices in Saudi Riyals (SAR)
ItemUnitQuantity
Selected Items: 0

Use this calculator for item quantities. For a floor area estimate, use the lump sum calculator above.

From Estimate to Construction

Save Your Budget and Request a Detailed Quote

Print the summary as a PDF or save it on your device, then share it for review and inspection. Any additional discount or warranty must be confirmed in the final written quotation.

Open Structure & Finishing ↗
Budget Guide

When Should You Use Item Quantities or a Floor Area Rate?

Use the detailed calculator when work quantities are known. At an early project stage, use floor area and quality level for an overall budget.

Finishing examples = total floor area × the saved lump sum quality rate. Examples update with saved prices and exclude project extras.

Riyadh Finishing Rate per Square Metre, 2026

What Can Increase Costs?

  • Higher specification flooring, doors, paint and marble.
  • Repairing defects or replacing installations, waterproofing and concealed works.
  • Complex gypsum and lighting details or timber, stone and marble cladding.
  • Additional bathrooms, kitchens and equipment.

What Determines the Budget?

  • Flooring type: ceramic, porcelain, parquet or marble.
  • Paint and waterproofing specifications.
  • Gypsum ceiling details and lighting fittings.
  • Bathroom and kitchen count and fixture quality.
  • Required quality level and the materials and labour included in each item.

Project Follow-up After Quote Approval

Project stages, payments, contracts, site updates and photos follow the process agreed at contract signing.

Notes and Terms

Before Relying on the Estimate

  1. Figures are preliminary planning estimates, not final prices or a construction contract.
  2. The final quotation follows a site visit and review of quantities, specifications and work details.
  3. Each item states whether it is installation only or supply and installation. Material and labour responsibilities are confirmed in the final quotation.
  4. Prices depend on material quality, finishing level, additional works and site condition.
  5. Tax, inclusions and exclusions are stated explicitly in the approved quotation.
  6. Finishing durations are indicative and depend on area, work type and material availability.
  7. Riyadh inspections and any special discount or additional warranty require company confirmation and written terms before work starts.
Clear Answers

Finishing Cost FAQs

What Is the Finishing Rate per Square Metre in Riyadh?

Is the Calculator Result a Final Price?

No. It is an initial budget. Pricing is confirmed after inspection and review of technical details and quantities.

Does the Cost Include Materials and Labour?

This depends on the item description. Some items are installation only; others include supply and installation. The final scope is confirmed after inspection.

What Is the Difference Between Commercial, Standard and Luxury?

Material, equipment, accessory and execution specifications vary to suit the selected budget and quality level.

How Long Does Villa Finishing Take?

An indicative duration is 4–12 weeks, subject to project area, scope and material availability before the programme is approved.

Is the Riyadh Inspection Free?

The reference page advertises a free Riyadh inspection. Please confirm availability and conditions with Syaq Al Tashyeed when booking.

Estimated Total0 SAR
Version Settings

Edit Items and Prices

Prices are stored centrally for all visitors. Only the owner may change them.

Lump Sum Settings

Edit service and extra rates and area factors in Lump Sum Settings.

Items

Shared settings for all visitors, protected by owner access.